Malaysia villa supporting equipment distribution cabinet project

Guozhiyun customized a complete set of power distribution cabinets for the villa project in Malaysia. Guozhiyun customized the design based on the characteristics of the villa building, including the main power distribution cabinet and 32 branch sub-distribution cabinets. We specially designed the "rib connection method" for the main power distribution cabinet.

Guozhiyun customized a complete set of power distribution cabinets for the villa project in Malaysia. In the design of power distribution for villas in Malaysia, we took into account the decentralized and seasonal characteristics of villa buildings and the three-phase power supply requirements for indoor villas. In Malaysia, the low-voltage power distribution system adopts a frequency of 50Hz±1% and a voltage standard of 415Vhttps://www.gzyelecauto.com240V. These electrical parameters all follow the IEC standard. Therefore, when designing a power distribution cabinet for a villa project in Malaysia, the design of the power distribution cabinet needs to meet these requirements. Guozhiyun customized the design of 32 sub-distribution cabinets including the main distribution cabinet and the side branches according to these requirements. We specially designed the "rib connection method" for the main distribution cabinet. This connection method ensures the safety of the power distribution system, while also taking into account the convenience of installation and maintenance.

This connection method has the following advantages:

1. Reasonable structure: spacious wiring space, large volume, multi-layer protective partition, the main switch adopts multi-functional decorative panels, and the switch can be replaced at will.

2. Safe operation: multi-layer protective partitions isolate the operator from the live parts, and each layer of door panels is connected to the ground bar to ensure the safety of the operator.

3. Convenient disassembly and assembly: the box body and safety bracket, inner door, outer door, etc. can be separated and taken out at will. Let the box body be pre-buried first. Ensure the one-time installation of the components in the distribution box to avoid damage.